River Valley Road Rezoning 2026: How to Read It Beside Parcel C

By Davis Ng ·

A River Valley Road planning amendment was approved on 14 July 2026, and it is close enough to attract attention from Parcel C readers. The important first step is classification: the amendment is an area planning record for named lots, not a new project document for River Valley Green Parcel C.

What URA approved

URA’s gazetted list says Lots TS24-00546W, TS24-00548P and TS24-00547V at River Valley Road were rezoned from Residential at a gross plot ratio of 1.4 to Residential with Commercial at 1st Storey at a maximum permissible gross plot ratio of 1.4. The approval date is 14 July 2026.

The change adjusts the permitted first-storey use while keeping the stated maximum plot ratio. It does not publish a developer name, unit count, layout, price or completion programme for River Valley Green Parcel C.

Why Parcel C should stay separate

URA’s current GLS list records River Valley Green (Parcel C) as an awarded residential site. The Parcel C project record has its own tender, developer consortium and estimated yield. None of those facts are replaced by a zoning amendment involving separately identified River Valley Road lots.

The decision for a Parcel C household

  • Use project details for Parcel C’s awarded-site facts and the separate developer record.
  • Use the location page to understand the River Valley and Singapore River setting without assigning a nearby lot’s access to Parcel C.
  • Ask whether any future drawing or approval names Parcel C directly before treating it as project evidence.
  • Keep price, unit mix, TOP and sales timing tied to a dated developer or authority document on the updates page.

The safe takeaway

The 14 July amendment is a real, current planning change near the River Valley cluster. It may be useful context for how ground-floor uses are planned in the area, but it does not alter Parcel C’s identity or announce a home-level opportunity. Freshness here means recording the nearby change with its exact scope and leaving direct project claims at their existing evidence state.

Get River Valley Green Residences (Parcel C) Updates First

Get the latest price list, available units and floor plans for River Valley Green Residences (Parcel C) — no obligation.

By submitting, you consent to Davis Ng (ERA Realty Network Pte Ltd) contacting you regarding River Valley Green Residences (Parcel C).

Showflat Contact